Specification | Overhead Or Top Running Crane are mainly Of Two Types:- 1) Single Girder EOT Crane : • This type of crane consists of single I-Beam or single Box-type Girder in accordance with span requirements. • Electric Hoist is directly mounted under that I-Beam or Box Girder. • For lower capacities, generally industries prefer use of Single Girder EOT cranes. • Being cost-effective and reliable in most of the working conditions, Single Girder EOT crane is most suitable in small and medium scale industries. 2) Double Girder EOT Crane : • As tonnage weight to be lifted increase with longer spans, we provide the option of Double Girder EOT crane as perfect solution for such working conditions. • This type of crane consists of two Box-type Girders with motorized End-carriages on both ends. • Electric Crab is used instead of Electric hoist for dual runways. • Double Girder crane allows Hook to be brought up between the girders to improve the hook height. • Because of two girders are used to carry the load, longer spans can be bridged and higher capacities can be achieved. |
Overhead Or Top Running Crane are mainly Of Two Types:-
1) Single Girder EOT Crane :
• This type of crane consists of single I-Beam or single Box-type Girder in accordance with span requirements.
• Electric Hoist is directly mounted under that I-Beam or Box Girder.
• For lower capacities, generally industries prefer use of Single Girder EOT cranes.
• Being cost-effective and reliable in most of the working conditions, Single Girder EOT crane is most suitable in small and medium scale industries.
2) Double Girder EOT Crane :
• As tonnage weight to be lifted increase with longer spans, we provide the option of Double Girder EOT crane as perfect solution for such working conditions.
• This type of crane consists of two Box-type Girders with motorized End-carriages on both ends.
• Electric Crab is used instead of Electric hoist for dual runways.
• Double Girder crane allows Hook to be brought up between the girders to improve the hook height.
• Because of two girders are used to carry the load, longer spans can be bridged and higher capacities can be achieved.